Hafoty Ucha

Owner : Tegni Developer: Tegni Operation : Tegni Construction:

Three phases, phase 1: 1998, Phase 2: 2003, Phase 3: 2005.

Located in North Wales the site has been developed, constructed and is owned and operated by Tegni. With the first machine having been installed in 1998, and comprising 4 Vestas V44 and V52 turbines of 3.15MW installed capacity the site has been running for some 12 years.

The site provides power for the equivalent of at least 2,200 homes in the locality, or approximately the amount of energy used annually by Ysbyty Glan Clwyd. Connected to the local 11kV network the site incorporates a unique voltage regulation system.

Hafoty Ucha